Instructions for Patch-N-Go Repairs
Surface Preparation
- Patch should be applied at temperatures above 40 F.
- It is critical that the surface has been cleaned of any surface contaminants such as dirt, water, or oil.
- Remove surface contaminants with the Alcohol Swab that has been provided in the Patch-N-Go Kit. Allow the alcohol to evaporate.
It is not necessary to roughen or use a primer before placing patch on the area in need.
Application Instructions
- Be sure the patch extends at least 1" from all damaged areas.
- Partially peel back the backing on the patch and apply the leading edge of the adhesive backed film to the cleaned surface.

- Apply the patch slowly, removing the backing while smoothing the patch.
- Minimize trapped air under the patch by working the patch from the center outward toward the edges.
- Once the patch has been applied, vigorously rub the patch with the plastic squeegee to enhance the
bonding. Never peel back the patch from the material to determine if it is adhering to surface of item being repaired; this can destroy the bond. - The patch will display excellent initial bonding within minutes of application, and the item will be ready for use. Further bonding will take place as the adhesive cures.